
Industrial Lifting Solutions
Reliable Lifting
Equipment for a
Stronger Tomorrow
Krandura provides high-quality lifting solutions for global industries, helping your business move forward.
Product Categories
All productsOverhead Crane
Overhead cranes travel on runway beams fixed to the building structure, so the load path goes into the columns rather than the floor. Single girder cranes suit spans up to roughly 20 m and light to medium duty; double girder cranes give a higher hook approach, longer spans, heavier duty classes and a platform for the trolley and panel. Choose on span, lift height, duty class and available headroom — not on capacity alone.
Gantry Crane
Gantry cranes run on rails at ground level instead of on runway beams, so they need no building structure along the travel. A full box girder gantry has an A-frame leg at each side and suits outdoor yards, storage bays and precast or stock handling. A semi gantry crane uses one leg and one existing runway, which is useful where only part of the bay can take a new track. The foundation and yard bearing capacity are part of the decision.
Jib Crane
Jib cranes cover a workstation rather than a bay. A pillar jib stands on its own foundation and can be placed wherever the process needs it; a wall-mounted jib saves floor space by hanging from a wall or column. Reach, lift height and the structure that carries the bracket matter more than capacity. Choose the coverage first, then the capacity — it usually reduces both the cost and the civil work.
Electric Hoist
Electric wire rope hoists lift vertically and are used either as a stand-alone unit on a fixed frame or as the lifting component of a crane. A fixed hoist serves one position; a hoist with a trolley adds horizontal travel along a monorail or a beam. Lift height, mounting arrangement, control and the way the load is attached are the parameters that decide the unit.
Featured Products
View allApplications
All applicationsApplication Scenarios
All projects
Saudi Arabia · 2025 · illustrative
Saudi Foundry — 50t Ladle Crane
50t × 25m span, FEM 1B, 1 unit
View project
Turkey · 2025 · illustrative
Turkey Steel Plant — 20t Overhead Crane Project
20t × 30m span, FEM 2M, 2 units
View project
Brazil · 2024 · illustrative
Brazil Steel Service Center — 25t Crane
25t × 24m span, FEM 2M, 2 units
View projectEngineering Resources
All articlesNeed a quotation for your project?
Request a Quote

